PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued fireproofing the 2nd Floor Facing North-East 800x600).jpg Continued installing sprinkler piping at the 1st Floor Facing West (800x600).jpg Core Drilling and installing conduit at the 3rd Floor (Jury Box 370) (800x600).jpg Cut beam pockets at the roof of Stair -4 Facing East (800x600).jpg Duct Work delivery for the 1st Floor Facing East(800x600).jpg Installed electrical wire at the 3rd Floor Facing East (800x600).jpg Installed steel plates at the perimeter of the roof to support the metal decking (800x600).jpg Installing duct work at the 1st Floor Facing North (800x600).jpg Installing Top track at the 3rd Floor Facing East (800x600).jpg
Previous pageNext page Duct Work delivery for the 1st Floor Facing East(800x600)
Duct Work delivery for the 1st Floor Facing East(800x600)